Let’s install the front baffle first,
First install the left side and put it in:

Then, the baffle installation is completed:

Then we install the solvent tank,
Install the air control pipe here, be sure to install it in place and insert it with force:

Then clip it in. There are two pillars corresponding to two holes:

Then we insert it in, and we must firmly plug it in, because if the two holes and sealing rings are not firmly inserted, air will leak:

Screw in black screws:

Then remove the Yellow plug on the outside of itm02 Maintenance Kit:

Then these O-rings are here:

Here’s the chip:

When installing the Maintenance Kit, the two must be in place, otherwise ink will leak:

Installation complete:
